Up Next
Go up to 2.5 Meetings
Go forward to 9-11 January 1998: Bremen Meetings (Tools, Methodology, Language Design)

1-4 April 1998: Lisbon Meetings (Reactive Systems, Language Design, Semantics, Tools)

Dates:
Wednesday 1 April 1998 from 4pm Reactive Systems
Wednesday 1 April 1998 from 4pm Language Design
Thursday 2 April 1998 lunchtime Coordination
Thursday 2 April 1998 after WADT Semantics
Friday 3 April 1998 after WADT Tools
Saturday 4 April 1998 after WADT Language Design, ctd.
Agenda:
Documents to be brought:
Further notes have been installed, and participants of the CoFI meetings in Bremen are requested to bring copies with them (as well as version 0.99 of the CASL Summary):
  • Till Mossakowski: Standard annotations for parsers and static semantic checkers - a proposal. Note T-6.
  • Mark van den Brand, Paul Klint, and Pieter Olivier: Aterms: Exchanging data between heterogeneous tools for CASL. Note T-3 (revised draft).
  • Till Mossakowski: Two "functional programming" sublanguages of CASL. Note L-9.
  • The following previously-announced notes should also be brought to Lisbon:
  • Hubert Baumeister: Methodological considerations on the use of extension and union. Note M-1.
  • Christine Choppy: Note on data type declaration. Note M-2.
  • Maura Cerioli: Different kinds of subsorting in CASL. Note M-3.
  • Michel Bidoit, Don Sannella, and Andrzej Tarlecki: Architectural specifications in CASL. Note M-4.
  • Till Mossakowski: Sublanguages of CASL. Note L-7.
  • Anne Haxthausen, Bernd Krieg-Brückner, and Till Mossakowski: Extending CASL with higher-order functions - design proposal. Note L-8.
  • Location:
    At the ETAPS/WADT venue
    Travel:
    The official carrier of ETAPS is TAP ­- AIR PORTUGAL. Its offices throughout the world will be happy to assist in your travel arrangements. Please contact your local TAP office for the special 15% reduction that has been negotiated for ETAPS participants [ETAPS'98].
    Accommodation:
    To be arranged through ETAPS
    Registration:
    Since all participants at the CoFI meetings will presumably be attending ETAPS and/or WADT, no separate registration is required. However, please let the relevant task group coordinators know which meetings you are planning to attend.

    CoFI : CoFI -- Version:  -- November 16, 1999.
    Comments to pdmosses@brics.dk

    Up Next