|
|
||||||||||||||
|
Scan Scheduling Specification and Analysis
Bruno Dutertre Technical Report, System Design Laboratory, SRI International, May 2000. |
|||||||||||||||
|
Abstract
We investigate the construction of fixed schedules for an EW receiver that ensures that n disjoint frequency bands are periodically visited for a given time interval. Two parameters the dwell time and the revisit time are given for each frequency band. The problem is to compute a global schedule, such that, for all i, the receiver covers band i for an interval of dwell-time length in every interval of revisit-time length. We give necessary and sufficient conditions for this problem to have solutions. We prove that the problem is NP-complete. We present a depth-first search algorithm for obtaining a solution and discuss simplification techniques that reduce the search space. Download BixTex Entry
@TechReport{dutertre2000,
AUTHOR= {Dutertre, Bruno},
TITLE= {Scan {S}cheduling {S}pecification and
{A}nalysis}
INSTITUTION= {System Design Laboratory,
SRI International},
MONTH= May,
YEAR= 2000,
ADDRESS= {Menlo Park, CA}
}
|
|||||||||||||||
|
|
|
|
|